Página 1 - Maintenance Manual

Goulds PumpsInstallation, Operation, andMaintenance ManualModel 3796 i-FRAME

Página 2

• Make sure that you have a clear path of retreat.• Make sure that the product cannot roll or fall over and injure people or damage property.• Make s

Página 3 - Table of Contents

SCALE 0.1504. Check the frame-face runout by rotating the shaft so that the indicator measures the fit for 360º.If the total indicator reading is g

Página 4

370B496B108360Dc) Install the dowel pins (469B) and bolts (370B). Tighten the bolts in a criss-cross pattern accordingto the specifications in the bol

Página 5

333AINPRO labyrinth oil seal descriptionDescriptionThe INPRO VBXX-D Labyrinth Oil Seal consists of the rotor (1), the stator (2), and the VBX Ring (3)

Página 6 - Introduction and Safety

NOTICE: The edges of the keyway can be sharp. Make sure to cover the keyway with tape. Failure todo so may result in cutting the O-ring and damaging

Página 7

Seal the shaft with a packed stuffing boxWARNING:Packed stuffing boxes are not allowed in an ATEX-classified environment.Pumps are shipped without the

Página 8 - Environmental safety

Refer to the Impeller clearance setting topic for more information.6. Tighten the setscrews in the seal locking ring in order to secure the seal to th

Página 9 - User health and safety

c) Install the shaft sleeve (126).412A1011262. Mark the shaft and sleeve at the face of the seal chamber.3. Continue the complete reassembly of the pu

Página 10 - Clean chemicals from the body

370H184 b) Check the seal-chamber cover runout.Rotate the indicator through 360 degrees. If the total indicator reading is greater than 0.005 in.(0.1

Página 11

412A1011262. Mark the shaft and sleeve at the face of the seal chamber.3. Continue the complete reassembly of the pump, except for the mechanical seal

Página 12 - Product approval standards

1013. Loosen the clamp bolts (370C) and the jack bolts (370D).4. Measure the gap between the impeller (101) and the seal chamber and stuffing-box cove

Página 13 - Certificates of conformance

General guidelinesATEX compliance is only fulfilled when the pump is operated within its intended use, for example withinits intended hydraulic range.

Página 14

.030101For more information on how to set the impeller clearances, refer to the Impeller-clearance checks andImpeller-clearance setting sections in Co

Página 15 - ATEX notification

Post-assembly checksPerform these checks after you assemble the pump, then continue with pump startup:• Rotate the shaft by hand in order to make sure

Página 16

418351100418351340 1004. Install and then hand-tighten the casing bolts (370).Refer to the bolt torque values for information on how to tighten the ca

Página 17

6. Reinstall the shims under the frame foot and tighten the frame foot to the baseplate.Make sure that you use the proper shim. Mount a dial indicator

Página 18

Table 18: Maximum torque values in lb-ft (Nm) for casing boltsModels 3196, CV 3196 LF 3196, 3796 with 150 lb(68 kg) casing flangesModel HT 3196 and al

Página 19 - Transportation and Storage

• Impeller O-ring (412A)• Bearing-housing O-ring (496)• Outboard labyrinth-seal rotary O-ring (497F)• Outboard labyrinth-seal stationary O-ring (497G)

Página 20

Table 22: Lubricating-grease requirementsPumpage temperature less than350°F (177°C)Pumpage temperature greaterthan 350°F (177°C)NGLI consistency 2 3Mo

Página 21 - Frostproofing

Item Number Size Description Quantity113 1/4"-18 NPT External hex/square headpipe plug2113A 1/2"-14 NPT External hex/square headpipe plug119

Página 22 - Product Description

TroubleshootingOperation troubleshootingSymptom Cause RemedyThe pump is not deliveringliquid.The pump is not primed. Re-prime the pump and check that

Página 23 - Part description 3796

Symptom Cause RemedyThere is excessive leakagefrom the stuffing box.The packing gland is not adjusted properly. Tighten the gland nuts.The stuffing bo

Página 24 - Condition Monitor

Equipment for monitoringFor additional safety, use condition-monitoring devices. Condition-monitoring devices include but are notlimited to these devi

Página 25 - Nameplate information

i-ALERT™ Condition Monitor troubleshootingSymptom Cause RemedyThere are no green or red flashing LEDs. The battery is dead. Replace the condition moni

Página 26

Parts Listings and Cross-SectionalDrawingsParts listTable 24: Construction material and quantityItem Quantity Part name Pump MaterialAll D.I. D.I. Wit

Página 27

Item Quantity Part name Pump MaterialAll D.I. D.I. With316 SSimpellerAll 316SS AllCD4MCuAll Alloy 20360C 1 *** Gasket—Thrust End CoverBuna360D 1 Gaske

Página 28 - Installation

Item Quantity Part name Pump MaterialAll D.I. D.I. With316 SSimpellerAll 316SS AllCD4MCuAll Alloy 20497N 1 O-Ring Internal (outboard)Viton503 1 Adapte

Página 29 - Foundation requirements

Item Quantity Part name Pump MaterialAll 317SS All Monel All Nickel AllHastelloy CAllHastelloy B332A 1 Outboard Labyrinth Seal w/O-ringsBrass ASTM B50

Página 30 - Piping checklists

Item Quantity Part name Pump MaterialAll 317SS All Monel All Nickel AllHastelloy CAllHastelloy B497F 1 O-Ring—Outboard Labyrinth RotorViton497G 1 O-Ri

Página 31 - Suction-piping checklist

Item Quantity Part name Pump Material (3196,HT 3196, CV 3196,3796)Pump Material (NM3196)Pump Material(3198)All Titanium Vinylester D.I./Teflon241 1 Fr

Página 32 - Installation (Continued)

Item Quantity Part name Pump Material (3196,HT 3196, CV 3196,3796)Pump Material (NM3196)Pump Material(3198)All Titanium Vinylester D.I./Teflon428 1 Ga

Página 33 - Discharge piping checklist

Material Goulds materialcodeASTM Din ISO JIS317SS 1209 A744CG-8M 1.4448Hastelloy C 1215 A494 CW-6MCD4MCu 1216 A744CD4MCU 9.4460Hastelloy B 1217 A494 N

Página 34 - Baseplate-mounting procedures

Eitherside100101412A370H184408418126333A497H469B168408A241408L319423B370D497G332A122400497F136382370C134496112228A372T761B113A370B360D497J370108351361

Página 35 - Figure 8: Side view

Certificates of conformanceCSA CertificateIntroduction and Safety (Continued)Model 3796 i-FRAME Installation, Operation, and Maintenance Manual 11

Página 36

497F332A497G370C370D423134496136382112A361A400122370E241408A408L370B319408W113A372T761B408W408N408M 168AFigure 30: MTi bearing-frame exploded view497

Página 37

555C555B551D494555B555CFigure 32: Finned-tube oil cooler exploded viewParts Listings and Cross-Sectional Drawings (Continued)Model 3796 i-FRAME Instal

Página 38

Other Relevant Documentation or ManualsFor additional documentationFor any other relevant documentation or manuals, contact your ITT representative.Ot

Página 40 - Level measurements

How did we measure up?It is our sincere intention to exceed our customer’s expectations on every order. Tellus if we achieved our goal on your order.

Página 41 - Pump-to-driver alignment

Introduction and Safety (Continued)12 Model 3796 i-FRAME Installation, Operation, and Maintenance Manual

Página 42

ATEX notificationIntroduction and Safety (Continued)Model 3796 i-FRAME Installation, Operation, and Maintenance Manual 13

Página 43

IECEx Certificate of ConformityIntroduction and Safety (Continued)14 Model 3796 i-FRAME Installation, Operation, and Maintenance Manual

Página 44

Introduction and Safety (Continued)Model 3796 i-FRAME Installation, Operation, and Maintenance Manual 15

Página 45

Chinese Certificate of ConformityIntroduction and Safety (Continued)16 Model 3796 i-FRAME Installation, Operation, and Maintenance Manual

Página 46 - Grout the baseplate

Transportation and StoragePump handlingWARNING:• Make sure that the pump cannot roll or fall over and injure people or damage property.• These pumps m

Página 48 - Shutdown

NOTICE: Do not use this lifting method to lift a Polyshield ANSI Combo with the pump and motormounted. Doing so may result in equipment damage.Figure

Página 49 - Driver-side end plate

Pump storage requirementsStorage requirements depend on the amount of time that you store the pump. The normal packaging isdesigned only to protect th

Página 50 - 3. Driver

Product DescriptionGeneral description 3796The 3796 is a horizontal overhung, self-priming, open impeller, centrifugal pump.This model is based on 3 p

Página 51 - Impeller-clearance check

Part description 379631963796HT 3196CV 3196LF 31963198NM 3196Casing Impeller Cover Power endFigure 6: 3796 part descriptionThis table describes the pu

Página 52 - Impeller-clearance setting

CoverStandard seal• The 3796 is available with a stuffing-box cover designed for a packing and a BigBore or a TaperBorePLUS seal chamber.Optional seal

Página 53 - Couple the pump and driver

Variable LimitVibration 100% increase over the baseline levelBattery lifeThe i-ALERT Condition Monitor battery is not replaceable. You must replace th

Página 54 - Install the coupling guard

Table 5: Explanation of nameplate on the pump casingNameplate field ExplanationIMPLR. DIA. Impeller diameter, in inchesMAX. DIA. Maximum impeller diam

Página 55 - 4. Jam nut

Nameplate on the bearing frameTable 7: Explanation of the nameplate on the bearing frameNameplate field ExplanationMOD. Pump modelSIZE Size of the pu

Página 56

InstallationPreinstallationPrecautionsWARNING:• When installing in a potentially explosive environment, make sure that the motor is properly certified

Página 57

Foundation requirementsRequirements• The foundation must be able to absorb any type of vibration and form a permanent, rigid support forthe pump unit

Página 58 - Bearing lubrication

Table of ContentsIntroduction and Safety...

Página 59

Piping checklistsGeneral piping checklistPrecautionsCAUTION:• Never draw piping into place by using force at the flanged connections of the pump. Thi

Página 60 - Shaft-sealing options

Example: Installation for expansionCorrect Incorrect11. Expansion loop/jointSuction-piping checklistPerformance curve referenceSuction-piping checksCh

Página 61 - Pump priming

Liquid source below the pumpCheck Explanation/comment CheckedMake sure that the suction piping is free fromair pockets.This helps to prevent the occur

Página 62 - Activate the i-ALERT

Example: Suction piping equipmentCorrect Incorrect123451. Suction pipe sloping upwards from liquid source2. Long-radius elbow3. Strainer4. Foot valve5

Página 63

Example: Discharge piping equipmentCorrect Incorrect12341. Bypass line2. Shut-off valve3. Check valve4. Discharge isolation valve211. Check valve (inc

Página 64 - Shut down the pump

11. Shims or wedgesFigure 7: Top view11. Shims or wedgesFigure 8: Side view3. Lower the baseplate carefully onto the foundation bolts.4. Put the machi

Página 65 - Reset the i-ALERT

d) Make sure that the center jackscrews do not touch the foundation surface yet.12341. Jackscrew2. Baseplate3. Foundation4. Plate3. Level the driver m

Página 66 - Maintenance

1234561. Driver's mounting pads2. Machinist's levels3. Foundation bolts4. Jackscrews5. Grout hole6. Pump's mounting pads6. Hand-tighten

Página 67 - Bearing maintenance

12345671. Upper jam nut2. Follower3. Washer4. Foundation pads5. Spring6. Upper adjusting nut7. Spring studFigure 9: Example of an installed spring ass

Página 68

123456781. Mounting plate2. Mounting nut3. Stilt bolt4. Foundation cups5. Washer6. Upper adjustment nut7. Mounting washer8. Mounting boltFigure 10: Ex

Página 69 - Shaft seal maintenance

Impeller-clearance check...

Página 70 - Disassembly

Baseplate-leveling worksheet1234567891011121314151617181)____________________2)____________________3)____________________4)____________________5)_____

Página 71 - Remove the coupling

Install the pump, driver, and coupling1. Mount and fasten the pump on the baseplate. Use applicable bolts.2. Mount the driver on the baseplate. Use ap

Página 72

When WhyPeriodically This follows the plant operating procedures.Permitted indicator values for alignment checksNOTICE: The specified permitted readin

Página 73

a) Attach one indicator (P) so that the indicator rod comes into contact with the perimeter of thedriver coupling half (Y).This indicator is used to

Página 74 - Impeller removal

1. Set the angular alignment indicator (A) to zero on left side of the driver coupling half (Y), 90° fromthe top-center position (9 o’clock).2. Rotat

Página 75 - Seal-chamber cover removal

YXShimsFigure 13: Side view of an incorrect vertical alignment4. Repeat the previous steps until the permitted reading value is achieved.Perform paral

Página 76

2. Rotate the indicators through the top-center position to the right side, 180° from the start position(3 o’clock).3. Record the indicator readings.4

Página 77 - Power-end disassembly

When you pour the grout, remove air bubbles from it by using one of these methods:• Puddle with a vibrator.• Pump the grout into place.5. Allow the gr

Página 78

Commissioning, Startup, Operation, andShutdownPreparation for startupWARNING:• Failure to follow these precautions before you start the pump will lead

Página 79

Driver3. Remove the nut, bolt, and washers from the driver half of the coupling guard.4. Remove the driver-side end plate.DriverDriver-side end plat

Página 80

Bearing-housing inspection...

Página 81

AnnularDriverDriver-side coupling guardgroove6. Remove the remaining nut, bolt, and washers from the pump half of the coupling guard.It is not neces

Página 82 - Disassemble the bearing frame

Check the rotationWARNING:• Operating the pump in reverse rotation can result in the contact of metal parts, heat generation, andbreach of containment

Página 83 - Condition Monitor disposal

Impeller-clearance settingImportance of a proper impeller clearanceA proper impeller clearance ensures that the pump runs at high performance.WARNING

Página 84 - Pre-assembly inspections

Refer to the impeller clearance table to determine the correct clearance.9. Tighten the bolts evenly in this order:a) Tighten the locking bolts (370C)

Página 85 - Bearing-frame inspection

Couplings must have proper certification to be used in an ATEX classified environment. Use theinstructions from the coupling manufacturer in order to

Página 86 - C-face adapter inspection

1 234 1. Driver2. Pump end plate3. Bearing housing4. Jam nut3. Put the pump-half of the coupling guard in place:a) Slightly spread the bottom apart.

Página 87 - Figure 23: Stuffing box cover

12341. Annular groove2. Pump-side end plate3. Driver4. Pump half of the coupling guardThe annular groove in the coupling guard half must fit around th

Página 88 - Bearings inspection

The annular groove in the coupling guard half must face the motor.AnnularDriverGuard halfgroove6. Place the driver-side end plate over the motor shaft

Página 89 - Bearing-housing inspection

Slide to fitDriver10. Use a nut, a bolt, and two washers to secure the coupling guard halves together.11. Tighten all nuts on the guard assembly.WARNI

Página 90 - Reassembly

Temperature Oil requirementBearing temperatures exceed 180°F (82°C) Use ISO viscosity grade 100 with bearing-framecooling or finned-tube oil cooler. T

Página 91

Introduction and SafetyIntroductionPurpose of this manualThe purpose of this manual is to provide necessary information for:• Installation• Operation

Página 92

Shaft-sealing optionsIn most cases, the manufacturer seals the shaft before shipping the pump. If your pump does not have asealed shaft, see the Shaf

Página 93

NOTICE:Make sure to lubricate the packing. Failure to do so may result in shortening the life of the packing and thepump.You must use an external sea

Página 94

Start the pumpCAUTION:• Immediately observe the pressure gauges. If discharge pressure is not quickly attained, stop the driver,reprime, and attempt t

Página 95

Magnet761BWhen the condition monitor is activated it:1. Displays a series of red LEDs followed by a solid green LED.2. Collects eight samples that are

Página 96

Pump operation precautionsGeneral considerationsCAUTION:• Vary the capacity with the regulating valve in the discharge line. Never throttle the flow f

Página 97

Deactivate the i-ALERT™ Condition MonitorNOTICE: Always deactivate the condition monitor when the pump is going to be shut down for anextended period

Página 98

MaintenanceMaintenance scheduleMaintenance inspectionsA maintenance schedule includes these types of inspections:• Routine maintenance• Routine inspec

Página 99 - Assemble the frame

Bearing maintenanceThese bearing lubrication sections list different temperatures of the pumped fluid. If the pump is ATEX-certified and the tempera

Página 100 - SCALE 0.150

Regrease the grease-lubricated bearingsNOTICE:Make sure that the grease container, the greasing device, and the fittings are clean. Failure to do this

Página 101 - Maintenance (Continued)

Bearing temperature Type of greaseExceed 350°F (177°C) Use a high-temperature grease. Mineral-oil greasesshould have oxidation stabilizers and a cons

Página 102

LimitationsThe warranty does not cover faults caused by these situations:• Deficient maintenance• Improper installation• Modifications or changes to t

Página 103 - Shaft sealing

Packed stuffing-box maintenanceWARNING:• Packed stuffing boxes are not allowed in an ATEX-classified environment.• Never attempt to replace the packin

Página 104

• Induction heater• Leveling blocks and shims• Lifting sling• Micrometer• Rubber mallet• Screwdriver• Snap-ring pliers• Torque wrench with sockets• Wr

Página 105

1. Is your bearing frame oil lubricated?• If No: Proceed to step 2.• If Yes:1. Remove the bearing-frame drain plug (408A) in order to drain oil from t

Página 106

2. Does your pump use a C-face adapter?• If Yes: Place one sling from the hoist through the frame adapter (108) or frame (228A) for the STiand a secon

Página 107

Clean surfaces prevent the casing gasket from partially adhering to the casing due to binders andadhesives in the gasket material.Remove the coupling

Página 108 - Install the impeller

4. Repeat step 3 until the impeller becomes loose.5. Remove and discard the impeller O-ring (412A).You will insert a new O-ring during reassembly.412A

Página 109

5. Remove the rotary portion of the seal from the sleeve by loosening the setscrews and sliding it off thesleeve.Refer to the mechanical-seal instruc

Página 110 - Attach the i-ALERT

1051841065. Remove the packing (106) and lantern ring (105) from the stuffing-box cover (184).A lantern ring does not come with self-lubricating graph

Página 111 - Post-assembly checks

3. Remove the shaft assembly from the bearing frame (228A).228A134370D423370C4. Remove the jack screws (370D) with nuts (423).5. Remove the bearing ho

Página 112

NOTICE: Use force only on the inner race when you press bearings off the shaft. Do not use forcein situations in which you might break a part. Doing

Página 113 - Assembly references

Hazard levelsHazard level IndicationDANGER: A hazardous situation which, if not avoided, willresult in death or serious injuryWARNING: A hazardous s

Página 114 - Spare parts

134236A496253B370D4235. Remove the bearing housing O-ring (496).6. Remove the clamp ring screws (236A) and separate the clamp ring (253B) from the bea

Página 115 - Lubrication conversion

11. Remove the outboard labyrinth oil seal (332A) from the bearing housing (134).Remove the O-rings (497F and 497G) if it is necessary. Labyrinth oil

Página 116 - Table 23: Bearing types

253B168A112A4961347. Remove the bearing housing O-ring (496) and the inboard bearing (168A).122168A248A112A136382253B8. Remove the bearing locknut (13

Página 117

• oil-fill plug (113A)• oil-drain plug (408A)• sight-oiler plug (408J)• four oil mist/grease connection plugs (408H)• oil-cooler inlet and outlet plug

Página 118 - Troubleshooting

2. Loosen the bolts attached to the bearing-frame flange and remove the C-face adapter from thebearing frame.Pre-assembly inspectionsGuidelinesBefore

Página 119 - Assembly troubleshooting

Gaskets, O-rings, and seats replacement• Replace all gaskets and O-rings at each overhaul and disassembly.• Inspect the seats. They must be smooth and

Página 120 - Troubleshooting (Continued)

Surface inspection locationsThis figure shows the areas to inspect for wear on the bearing frame outside surface.228Figure 19: Outside surface inspect

Página 121 - Drawings

Seal chamber and stuffing box cover inspectionChecklistPerform these checks when you inspect the seal chamber and stuffing box cover:• Make sure that

Página 122

444Figure 24: Dynamic-seal backplate184Figure 25: TaperBoreTM PlusBearings inspectionCondition of bearingsDo not reuse bearings. The condition of th

Página 123

Bearing-housing inspectionChecklist• Inspect the bearing-housing (134) bore according to the bearing fits and tolerances table.• Replace the bearing h

Página 124

Reference for electrical installationFor electrical installation requirements, consult your local electric utility.User health and safetySafety equipm

Página 125

Bearing fits and tolerancesThis table references the bearing fits and tolerances according to the ABEC I standard.Table 13: Bearing fits and tolerance

Página 126

d) Install the sight oiler plug (408J).e) Install the plug for the oil-cooler inlet (408L).f) Install the plug for the oil-cooler outlet (408M).g) Ins

Página 127

168361A1221123821369. Prepare the shaft for assembly as follows (see the illustration):a) Install a new O-ring (496).b) Coat the outside of the outbo

Página 128

134370D423228A370CAssemble the rotating element and the bearing frame ( STi and MTi withduplex bearings)CAUTION:• Wear insulated gloves when you use a

Página 129

319408N408A241370F408N408W372T113A408W408M761B2. Install the outboard bearings (112A) on the shaft (122).The regreasable bearing has a single shield.

Página 130

122168A253B382136112A9. Install the bearing housing as follows (see the illustration):a) Coat the outside of the outboard bearing (112A) with oil.b)

Página 131

a) Coat the outside of the bearing housing (134) with oil.b) Coat all the internal surfaces of the bearing frame (228) with oil.c) Install the shaft

Página 132 - For additional documentation

Make sure that the orientation of the bearing-clamp ring is correct.4. Install outboard bearings (112A) on shaft (122).The regreasable bearing has a s

Página 133

13411. Prepare the shaft for assembly as follows (see the illustration):a) Fasten the clamp-ring bolts (236A) crosswise.See the specified torque value

Página 134

Assemble the frame1. Support the frame assembly in a horizontal position.2. Check the shaft-end play by moving the shaft forward and backward by hand,